And image relating to this case study about 'Peterborough Green Energy Project'

Peterborough Green Energy Project

Peterborough Green Energy Ltd

Working with Wardell Armstrong, BHP Design, GEP Consulting and Environmental Visage on this flagship scheme to provide a clean energy facility serving Peterborough, Cambridgeshire and the surrounding area, we helped to successfully vary a condition relating to the scale of the operations and site layout.

The 80MW facility will take waste products which would otherwise be destined for landfill and will convert them to electricity using the very latest technology to provide a green energy solution.

The site already benefitted from consent to build a similar facility, but improved technology required a modified design hence why a variation to the condition was needed.
Prime were tasked with providing transport advice including the production of a Transport Environmental Statement chapter to identify the impacts of the proposed changes.

Photo credit: BHP Design